Lamborghini

Power: 
1.1 MW
Status: 
In operation
Scope: 
Turn Key Project
Technology: 
Rooftop

 This project consists of a photovoltaic plant of 1.168 MW divided into 3 phases with solar panels on the roof of the Lamborghini factory.

The construction of this plant presented a huge technical challenge as it was necessary to implement the project without disturbing the normal activity of the factory. We had to deal with important technical constraints, respect distances and space requirements.

 The process comprises three phases:

  • Lamborghini I: construction of 120 kw.
  • Lamborghini II: construction of 938 kw.
  • Lamborghini III: construction of 110 Kw. 

This innovation allows a dual functionality: renewable energy is generated and at the same time placing the panels on the industrial cover of a car factory allows an ideal utilization of the surface. 

Multimedia

Calasparra

Power: 
20 MW
Status: 
In operation
Scope: 
Turn Key Project
Technology: 
Fixed

This project consists of a photovoltaic plant of 20 MW divided into 3 phases with a fixed structure.

  1. Economic viability: There was a need to seek for partners to invest in the project.
  2. Technical challenge: This project, one of the major plants in the world, has been built in record time. The construction of the photovoltaic plant was made up in less than a year.
  3. Parallel construction of one of the largest solar plants in the world. Calasparra Solar Plant was built at the same time as Fuente Álamo.

The process comprises three phases:

  • Calasparra I: construction of 8 MW. 
  • Calasparra II: construction of 6 MW.
  • Calasparra III: construction of 6 MW.
  1. Low environmental impact: Reduction of 20.876 tons of CO2 emissions per year.
  2. Energy production of 21.281 MWh per year.
  3. It encourages job creation.