Undefined

Gestamp Biomass participa en Bioenergía 4.0 , evento celebrado en Valladolid el 27 de Septiembre en el marco de Expobioenergía 2017.  Gestamp Biomass presentó a la audiencia el nuevo paradigma en el que  su filial GBS Energy se adentra poco a poco, dejando atrás un mundo de caos y complicaciones en la gestión de tareas y actividades.

Date: 
07/Feb/2018
Highlighted: 
Suscribe to our RSS RSS

Adares

Power: 
10 MW
Status: 
01 In operation 25

Adares Wind Farm is located in Selcuk, in the Esmirna region, in the coast of the Aegean Sea. Thois is the second wind farm that the company has in Turkey.  

Adares has a power of 10MW, and it has 5 aero generators Gamesa G97 of 2 MWs of power and  an average production of 30.000 megawatts per hour annually, covering the demand of around 13.000 Turkish homes, avoiding the emission of 14.000 tons of CO2 annually.



 





Multimedia

English

Madrid, 14th of October of 2015. Gestamp Wind, the wind energy division from Gestamp Renewables, has opened the second wind farm in Adares, Turkey, with a power of 10 megawatts (MWs).

The wind farm has 5 aero generators Gamesa G97 of 2 MWs of power and will have an average production of 30.000 megawatts per hour annually, covering the demand of around 13.000 Turkish homes, and avoiding the emission of 14.000 tons of CO2 annually.

Category: 
Corporacion Gestamp
Gestamp Renewables
Gestamp Wind
Date: 
14/Oct/2015
Highlighted: 
Yes
Suscribe to our RSS RSS

Gestamp Solar, the first European photovoltaic developer that connects a project in Japan

Gestamp Solar, the photovoltaic solar energy division of Gestamp Renewables, publishes its first Sustainability Report.

English

Gestamp Renewables and KKR work together to accelerate the growth of this leading global solar PV developer and operator

Madrid / London, July 21, 2015. KKR a leading global investor, has reached a definitive agreement to acquire from Gestamp Renewables an 80% stake in Gestamp Asetym Solar, S.L. (“Gestamp Solar”), a premier global solar PV developer and operator. The investment is funded by KKR Global Infrastructure Investors II, a $3.1 billion global fund.

Category: 
Corporacion Gestamp
Gestamp Renewables
Gestamp Solar
Date: 
21/Jul/2015
Highlighted: 
Yes
Suscribe to our RSS RSS
English

Madrid, June 8, 2015. Gestamp Wind, the Wind division of Gestamp Renewables has been awarded with a 20 year PPA for Copperton wind farm, a 102 MW wind project located in the Northern Cape (South Africa).

Category: 
Gestamp Wind
Date: 
08/Jun/2015
Highlighted: 
Yes
Suscribe to our RSS RSS

Pages

Subscribe to Gestamp Renewables RSS