News of 2013

Gestamp Wind wins two wind projects in Brazil

Date: 
20/Dec/2013
Category: 
Corporacion Gestamp, Gestamp Renewables, Gestamp Wind

Madrid, December the 20th, 2013. Gestamp Wind the wind energy division of Gestamp Renewables (Corporación Gestamp) has win two new energy sale contracts in Brazil during 20 years for several projects, which will generate 50MWs. With these two parks, Gestamp Wind will own 404MWs in Brazil.

These wind parks suppose an additional investment of 70€ millions in Brazil. During the 20 years duration of the energy sale agreements, the...

Gestamp Wind Inaugura un nuevo parque eólico de 23,4 MW en Naguabo (Puerto Rico)

Date: 
12/Apr/2013
Category: 
Corporacion Gestamp, Gestamp Wind

(Madrid, April 12, 2013) Gestamp Wind, the wind energy division of Gestamp Renewables has started the commercial operation of the wind farm Puerto Lima, in Naguabo, Puerto Rico. The wind farm is composed by 13 turbines with Vestas Technology of 1,8 Mw each, summing up 23,4 Megawatts of nominal installed power. This new Gestamp wind, wind farm supposes an investment of 90 Million USD. Jon Riberas, President of Gestamp Renewables, Dionisio Fernandez Auray, CEO of Gestamp Wind, Javier Mateache, CEO of Gestam Wind North America, David Bernier, Secretary of State, PREPA representatives and...

GESTAMP SOLAR BEGINS TO OPERATE TWO SOLAR PHOTOVOLTAIC PLANTS IN PERU

Date: 
11/Mar/2013
Category: 
Corporacion Gestamp, Gestamp Solar

(Madrid, March the 8th,2013) Gestamp Solar, photovoltaic solar division of Gestamp Renewables, starts to operate two photovoltaic plants in Peru.

This Project is composed by two solar photovoltaic plants: one called “Tacna Solar” located in Tacna and the other one called  “Panamericana Solar” located in Moquegua, both in Peru. They have a total capacity of 40 megawatts (MW), 20 MW each. These two plants (40MW) currently provide electricity to the local area through the National Interconnected Electrical System (SEIN)....